Showing posts with label town square. Show all posts
Showing posts with label town square. Show all posts

Wednesday, December 8, 2010

Town Square Dedication

After the final worship service on Sunday, November 28, hundreds of Redeemer members and guests moved to the new Town Square for the dedication of this new Sacred Space.

Pastor Cary Richert lead those in attendance through a short dedication service, which borrowed from the 1957 order of dedication services for our then renovated sanctuary.Pastor Randy Schlak then invited the assembled group to proceed outside onto the steps of the new Main Entrance where the new date stone, marked "AD 2010", was blessed, before being permanently placed just outside the doors.Hundreds of members in the days leading up to the date stone laying ceremony had each drafted personal letters, to a future generation of Redeemer members. These "2010" letters, written by children and adults, were placed securely behind the new date stone, for the benefit of those in the future.



Below the "2010" stone now lays the "1970" date stone (that was moved 50 feet south from where it had been installed outside the old West Entrance.)

And just above the "2010" stone is a third stone, left blank, as an intentional signal to future Redeemer members to boldly consider what additional work may be needed to expand our mission and ministries in His name.

Many special guests attended the dedication service. Leadership Team President, Joe Conte, spoke, as did our Head Elder, Rick Russ. The services were also attended by our stewardship consultant, Greg Gibbs, our construction superintendent, Craig Collins, and the Mayor of the City of Birmingham, Gordon Rinschler. Also present were Rick McDonald and David Mammel who both served as Leadership Team President and Sacred Space steering committee members over the five year project term.
At the conclusion of the morning's celebration, Steve Scheidt was presented a special plaque for the new lower level classroom "named in thankfulness for his hard work and dedication to this Sacred Space we call Redeemer."

Friday, November 19, 2010

Carpet and Counters

Our new central gathering space, the Town Square, accessible from the new Main Entrance, is nearing completion. The number of tradesmen trucks parked in our lot each day is dwindling to just a handful.

The work this past week concentrated on carpet and counters as well as a host of other important details (working coffee pots, signs on the new bathrooms, labels on light switches, etc.)

Excitement is buiding as we move towards our Grand Opening and Dedication on Sunday, November 28. Remember, the Westmaple Rededication, lead by Pastor Mark Wuggazer, will take place at 10:00 a.m. that day. And the Town Square Dedication and Date Stone Laying, lead by Pastor Randy Schlak, will take place at 11:45 a.m. that day. Worship services are at 8:00 a.m. (chapel), 9:00 a.m. (sanctuary) and 10:30 a.m. (sanctuary.) Please join us for a great morning -- with special food and music planned throughout the building.

Friday, November 5, 2010

Whitewash

The painters arrived this week to begin the interior prep and painting of the Town Square. Things certainly look brighter than just a few days ago. Final coats will be applied next week. How about Easter Egg Purple?

Stairway to Heaven

Work continued this week around the Town Square including detailed carpentry work on the main staircase that connects the new lower level classrooms with the main level Town Square. The staircase will be carpeted and brass light fixtures placed on the walls.

Wednesday, November 3, 2010

Town Square Cafe

As you come into the Town Square through the new main entrance you immediately enter into a large lobby. To your right is the new nursery, a women's bathroom and sign clearly marking the way to the sanctuary. Straight ahead is a wall of windows that look onto the new renovated courtyard. To your left is a wood paneled fireplace which subtly separates the lobby from an adjacent space that has been nicknamed the Town Square Cafe.

This space includes cafe tables and seating around the fireplace and a long serving counter. Behind the serving counter is a simple layout of appliances and utensils for serving coffee and other food items (think Advent by Candlelight, November 30!)

Work is proceeding in all these areas this week, including cabinet installation, appliance installation, and painting.

Thursday, October 21, 2010

Town Square Finishes

Interior finishes continue throughout the main level of the town square. A team of finish carpenters are hard at working providing architectural detail around the fireplace, walls and columns that surround the open entry area and new cafe.
The interior wall construction is also nearly complete as the tradesman have successfully implemented a variety of arches around the entrance and main hallway leading from the sanctuary to the renovated gymnasium.

Friday, October 15, 2010

Town Square Interior Takes Shape

The interior of the Town Square is an active place these days. Dry wall workers and finished carpenters are all about completing the interior walls, counters, fireplace and hallways.