Work on the new city-mandated fire suppression system continues each day. You may have noticed the ceilings have been taken out of all the corridors. This is to allow the contractor to install the necessary "plumbing" to bring water sprinkling capability into the building. All the corridors on the first level, the new and renovated rooms on the first level and the entire lower level are being readied for the new system. In addition, the needed upgrades to our water main have been completed, from across Maple Road directly into our building. In the next two weeks the entire system will be connected and tested. Anyone need a shower? In the photo below you can see that a new ceiling grid has been put in place as we prepare to install the new ceiling at the end of the fire suppression work.