The concrete floor was poured throughout the lower level of the new Town Square at the end of the week. The photos below show the two new lower level classrooms and coffee area, as well as the new stairwell and storage closets. Once the floor and walls are adequately cured and the water proofing is installed, lots of steel will follow to ready the area for the next level of construction -- the new Town Square.
Friday, June 4, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment