Below is the view of the new main entrance looking across the new town square from the courtyard windows. The main entrance, visible on the left, will have two sets of double doors. The door on the right leads down stairs.And this is the view immediately upon entering Redeemer, looking directly across to the courtyard which will be framed entirely in a series of new windows. A few steps will lead from the town square out to the courtyard.Below is the view across the town square towards the gym. A fireplace will be constructed between the two beams on the left hand side of the photo. A wide, gentle ramp leads down to the gym, replacing the narrow stairs that were across from the book nook. This view of the town square looks back to the east at the current library. The plywood covers the current library window. The outside of the library will receive a face lift to match the wood panel and trim throughout the town square. A small cafe and serving counter will be constructed on the left side of the photo, for serving coffee or supporting group registrations, like VBS, Confirmation or Sunday School.
OK, it isn't a lion's den. But the new stairwell to the lower level classrooms was installed this past week. Now the construction workers (and members) won't have to climb extension ladders to reach the lower level. The stairwell is brightly lit with a large west-facing window.
A completely new women's bathroom just inside the main entrance doors is being constructed. (This will complement the existing women's bathroom just outside the gym, which is being completely renovated.) The door on the far left of the photo, just in front of the women's bathroom, is the door to the new nursery.
No comments:
Post a Comment