Block walls are being constructed inside the expanded Westmaple Nursery wing this week. Along with the steel and new roof you can begin to picture the two new classrooms and associated bathrooms. The photo below shows the new classroom on the west side of the Westmaple corridor. The door to the new bathroom, complete with junior-sized fixtures, is visible on the far left. The classroom on the west side of the Westmaple corridor is pictured below. The door on the far left (covered in plywood) has been cut through what was the end wall of Room 1. So now all four rooms on the west side of the corridor are connected. The door in the middle leads to the new bathroom. And the door to the right leads to the extended hallway. A new office for the Westmaple director is just visible on the far right.