Sunday, July 18, 2010

Town Square Brick and Concrete

Work on the new main entrance and town square is proceeding both inside and out.

The exterior of the town square and main entrance is currently receiving the matching Redeemer red brick. All the new brick in this area, as well as the completed brick work around the gym stage and Westmaple classrooms, will be washed at the end of the project to provide a perfect match.
Inside the town square concrete was poured on the first floor matching the existing grade to the sanctuary corridor, with a ramp down to the library and gymnasium level.
Corridor (above) leading to the sanctuary (temporary construction wall)Ramp (above) leading down to the library and renovated gymnasium.
New town square (above) viewed from coat room corner.