Work has begun on the new nursery. The photo immediately below shows the door to the nursery off the new main entrance. A three sided counter with cubbies will separate the children from those arriving for drop-off and pick-up.




The next photo shows the new nursery itself. The floor is being raised to the same elevation as the town square. This will also have the added benefit of insulating children from the slab floor as was the case with the old nursery. The door to the far right in the photo below will lead to a smaller room for cribs and nursing mothers.The nursery will also have it's own bathroom accessible only from inside the nursery. Additional counters, cabinets and a sink will also be installed just outside the bathroom.